CDM Coordinator Projects
A few handpicked projects
For over 10 years we have built up an enviable reputation with a Portfolio of schemes from PFIs, the Private Sector, Property Developers, Architects asisting an array of Clients providing creative solutions to complex problems.
Get an instant fee quote online now using our calculator
St Regis Hotels: The Lanesborough London.
A luxury 5 star Hotel located in the heart of London’s Knightbridge – to deliver CDM Coordinator services for the refurbishment to the Presidential Suite.
The works consisted of internal finishes designed by French interior designer Alberto Pinto, capturing the gracious style of the 19th Century with a touch of sophisticated audio equipment, and M& E Installation including luxury bathroom fixtures and fittings.
Darlow TV Productions: The Roman Villa – Channel 4.
A British Film production team appointed Veritas Consulting as CDM Coordinator to construct a Roman Villa Urbana ‘ “a Roman town house with high status” – on location of the reknowned 4th largest Roman city in Britain, at Wroxeter in Shropshire.
The design for €˜Villa Urbana” was inspired by an actual building excavated at this very important Roman site prepared by Professor Dai Morgan Evans, visiting professor in archaeology at the University of Chester.
Building a Roman Villa filmed for late Nov 2011 – the main aim behind constructing the Villa was to demonstrate the challenges the romans faced compared to modern day techniques – this included the use of similar tools and construction methods available during their period. The villa was built using local materials and suppliers and involved the local community and schools during the building process.
The National Trust: Hidcote Manor.
The National Trust appointed Veritas Consulting as CDM Coordinator for the refurbishment works to Hidcote Manor in the Cotswolds which sits in one of England’s greatest gardens made up of exquisite garden rooms, each possessing its own special character.
The Manor House including the garden areas needed extensive refurbishment works which involved upgrading the kitchens and Restaurant, The Garden Tea Room, Tennis court, public toilets amongst other buildings and surrounding garden areas, designs of which originated from historical records by Major Lawrence Johnston.
Müller Professional: Blenheim Court & Radcliffe House.
Müller Professional Services specialist property consultants approached us to provide CDM Coordinator Services for the refurbishment of Blenhium Court and Radcliffe House, a prominent Grade A office scheme over 6 floors in the heart of Solihull town centre.
The offices were fully refurbished to a Grade A specification including, new Lift cars, a spacious reception including, external re-configuaration to the grounds.
Again this project involved working closely with client with minimal disruption to the day to day activties.
Müller International: London, Birmingham, Manchester
Veritas Consulting have been appointed as CDM Coordinator by Muller Professional Services in London on a series of projects in Leeds, London, Manchester and Birmingham which involved replacing Chiller units upon the roof of a range of 8 – 10 storey office buildings due to poor performance and general wear and tear, all of which are surrounded by heavily trafficed highways and similar commercial businesses.
The works consisted of suitably sighting a crane to assist raising the redundent chiller units and associated plant to the ground and replacing the equipment with a high performance low carbon producing system. The client was under pressure from various constraints relating to faulty equipment, performance failure and downtime however, we ensured that the highest possible safeguards and health and safety standards were adhered too from start to finish across their portfolio, which pleased the client.
PCT: Solihull Care Trust – Health Clinics
Veritas Consulting were appointed to act as the CDM Coordinator and Construction Health and Safety Adsvisers on the refurbishment scheme at the PCT Health Clinic in Solihull which provides a sexual health advice centre and Dentistry for local residents.
The works involved extensive Asbestos Removal works and internal and external refurbishment throughout the building over a period of 8 months whilst certain parts of the building remained in operation by the PCT, the project involved carefull planning and working very closely with client in order to maintain the ongoing care service they provide for the residents – with minimal disruption to the day to day activties, which pleased the client.